Project Description
Scope of Work
- Fabricate and install 14 EA fixed steel pipe bollards
- Fill bollards with concrete and paint safety yellow
- Bead blast existing parking stall striping
- Paint new pavement markings
- Furnish and install pre-cast concrete wheel stops
- Install 6 signs and 3 mounted sign posts
- Saw-cut, demolish and remove designated opening in existing CMU wall at parking garage lobby for new elevator entryway
- Dispose of all debris
- Remove 1 existing concrete curb ramp
- Remove section of pavers at new concrete curb ramp location and infill area where existing ramp was removed
- Provided slab scanning
Project Details
Services
- Demo
- Striping
- Signage
Customer
Google • Mountain View, California
Jobsite
1600 Amphitheatre Pkwy • Mountain View, CA 94043