Project Description
Scope of Work
- Grade, Pave and Install/Paint 18 Bollards along with some No Parking Fire Lane
- Installed 18 bollards (17ftx6in) filled them solid with Concrete then Painted them Safety Red and striped them with one inch Tape
Challenges
- We planned on installing 8 Bollards but two days before the project, it suddenly jumped to 18 bollards
Project Details
Crew
- Run by Foreman Marcos Sandoval, Paul Valdez, Jesus Romo, Guillermo Bernal and Humberto Flores
Jobsite
45500 Fremont Blvd Fremont, California