Striping Project at Tracy Logistics Center – Tracy, CA

Project Description

Scope of Work

  • New Striping: Layout new striping. Stripe double stall lines, arrows, ADA stalls and stencils
  • Signage & Wheelstops: Furnish and install pre-cast concrete wheel stops and ADA signs on metal posts set in concrete footing. Furnish and install tow-away signs set in concrete footing.
  • Thermoplastic Striping: Cat track layout entire job. Apply all new thermoplastic pavement markings as shown on plans, includes symbols and green bike lane.
  • Signage: Furnish and install street signs as shown on off-site plans. No signs hanging from signals.
  • All salvaging of signs by others when they do the road demo, re-install by DRYCO.
  • Striping Removal: Grind and remove existing striping
  • Striping, Guardrail, and Removable Bollards: Stripe new path of travel, furnish and install removable bollards and double rib, double rail guardrails
Striping project by DRYCO
DRYCO team doing striping work
Applying stripe to an asphalt road surface
marking stripes on asphalt road surface

Project Details

Services

Customer

Alston Construction – San Jose

Jobsite

Tracy Logistics Center
Grant Line Rd & Chrisman Rd
Tracy, CA 95304