- General Conditions: Provide job site supervision, field verification, and on-site safety meetings.
- Crushed Rock: 4″ of 1/2 ‘ to 3/4″ crushed rock
- Pump and install a slurry on the Vapor Barrier.
- Matt Slab: Form edges and set reinforcing steel for matt slab. Pour and finish 24’’ concrete matt slab.
- Topping Slab: Form edges and set reinforcing steel for topping slab. Pour and finish 5’’ topping slab, includes saw cutting.
- Mezzanine Slab: Set reinforcing wire for the mezzanine slab. Pour and finish 5-/12’’ lightweight concrete slab slab, including 3 sets of stairs and curb
Project Details
Services
Customer
Kunzik and Sara Construction Inc. on behalf of Mercedes Benz of Palo Alto
Jobsite
Mercedes Benz of Palo Alto 1700 Embarcadero Rd, Palo Alto, CA 94303