Scope of Work

  • Place and compact 10,430 sf of varying thickness, totaling 1980 tons
  • Form edges and set waffle mat foundation boxes
  • Install post-tension cable reinforcement
  • Pour and finish 4″ thick concrete slab with a standard finish
  • Form and set reinforcing steel
  • Furnish, place and compact 525 SF of hot-mix asphalt pavement in one lift over designated area of new pavement
  • Includes 165 LF of header board, and includes utility trench patch back
  • Furnish and install CMU block wall
  • Fill cells solid with concrete slurry
  • Grout all joints with flush
  • Place and compact approximately 550 Sf of 24″ thickness of class II base rock
  • Furnish and install Tensar Triax 5 geotextile grid