Project Description
Scope of Work
- Place and compact 10,430 sf of varying thickness, totaling 1980 tons
- Form edges and set waffle mat foundation boxes
- Install post-tension cable reinforcement
- Pour and finish 4″ thick concrete slab with a standard finish
- Form and set reinforcing steel
- Furnish, place and compact 525 SF of hot-mix asphalt pavement in one lift over designated area of new pavement
- Includes 165 LF of header board, and includes utility trench patch back
- Furnish and install CMU block wall
- Fill cells solid with concrete slurry
- Grout all joints with flush
- Place and compact approximately 550 Sf of 24″ thickness of class II base rock
- Furnish and install Tensar Triax 5 geotextile grid