Concrete Work at AAA Gomentum Station – Walnut Creek, CA

Project Description

Scope of Work

  • Clean cracks 1/4″ & larger up to 1″ with high-pressure air, back fill deep cracks with sand and fill cracks with hot-applied crack sealer
  • Seal cracks 1/4″ and larger with Duro-Flex hot applied crack filler
  • Treat oil spots with Polyoil sealant
  • Slurry Seal 420,900 SF
  • Provide demolition and removal of Rail road wooden ties
  • Off-haul and dispose of all debri
  • Apply asphalt-leveling course as necessary to alleviate low and sunken areas
  • Furnish and install reinforced pavement fabric
  • Saw cut/ jack hammer to remove 380 LF of concrete curb flush to top of asphalt
  • Remove 80 SF of curb Island and off haul
  • Street Sweeping & Cleaning

Project Details

Services

Customer

AAA Northern California, 1277 Treat Blvd Walnut Creek, CA

Jobsite

AAA Go-Mentum Concord Naval Kinne Blvd, Concord, CA 94519