Asphalt Work at Omega Boys Club / Good Tidings – San Francisco, CA

Project Description

Scope of Work

  • Required approximately 5,800 SF of resurfacing and paint
  • Patched and filled multiple cracks that measured 2-3 inches in width and 1-3 inches in depth
  • Applied several coats of asphalt emulsion, grinded high spots down to a level surface and filled low spots up to a level surface

Challenges

  • Mixing station had to be in close proximity to our work truck which all together extends well beyond 25 feet in length
  • Partial lane closures were needed and addressed them with proper safety equipment
  • Had to work around the unpredictable weather while maintaining a clean, safe and quality job

Project Details

Services

Crew

  • Foreman on site was Leoncio Valdez and his helper Cosme Martinez

Customer

Omega Boys Club/ Good Tidings San Francisco, California

Jobsite

1060 Tennessee St. San Francisco, California