- Required approximately 5,800 SF of resurfacing and paint
- Patched and filled multiple cracks that measured 2-3 inches in width and 1-3 inches in depth
- Applied several coats of asphalt emulsion, grinded high spots down to a level surface and filled low spots up to a level surface
Challenges
- Mixing station had to be in close proximity to our work truck which all together extends well beyond 25 feet in length
- Partial lane closures were needed and addressed them with proper safety equipment
- Had to work around the unpredictable weather while maintaining a clean, safe and quality job
Project Details
Services
- Resurfacing and paint
- Asphalt emulsion
- Acrylic resurfacing
Crew
- Foreman on site was Leoncio Valdez and his helper Cosme Martinez
Customer
Omega Boys Club/ Good Tidings San Francisco, California