Project Description
Scope of Work
- Over 20,000 SF of 5” thick colored concrete sidewalk with curb walls.
- Worked in a multi-prime contract concurrently with several trades onsite.
- Includes concrete accessories such as key-kold joints, trench drains, bollards, and ADA embeds.
- Worked through real-time changes with Owner/CM and overcame weather obstacles.




Project Details
Services
- Concrete
- Bollards
- ADA
- Colored concrete
Customer
Kramer Project Development- 4020 Moorpark Ave #220 San Jose, CA 95117
Jobsite
C.T. Middle School – 23800 Summit Rd Los Gatos, CA 95033