Concrete Work at Kramer Project Development – San Jose, CA

Project Description

Scope of Work

  • Over 20,000 SF of 5” thick colored concrete sidewalk with curb walls.
  • Worked in a multi-prime contract concurrently with several trades onsite.
  • Includes concrete accessories such as key-kold joints, trench drains, bollards, and ADA embeds.
  • Worked through real-time changes with Owner/CM and overcame weather obstacles.

Project Details

Services

  • Concrete
  • Bollards
  • ADA
  • Colored concrete

Customer

Kramer Project Development- 4020 Moorpark Ave #220 San Jose, CA 95117

Jobsite

C.T. Middle School – 23800 Summit Rd Los Gatos, CA 95033